Wednesday 20th June 2012 Report

June 20, 2012
Filed under: Junior Members 

Wednesday Report for 20th June 2012:
A fairly quiet if sunny day today at Northcliff, firstly the back door is now completely finished, painted green and fully working! We’ve had a look at some of the bad sections of track and decided that some major work needs doing on two or three places. The base of the new whistle sign has been installed near the cutting. An attempt has been made at a more effective temporary fix to the damaged point but it was unsuccessful as we discovered it requires welding and grinding, as a result of this 5″ gauge trains will be unable to pass through the centre track on the ground level station, so a label has been put in the signal box to remind the signalman and the 5″ railhead has also been marked. The signalbox has been tested. The tail marker brackets have been installed on the back of all of the trucks. And finally new member Matty Wood has been welcomed and shown round the site.

Comments

You must be logged in to post a comment.

  • Archives

  • Upcoming Events

    • 04 Dec 2024 @ 19:30
      December Meeting 2024
      » read more «
    • 27 Dec 2024 @ 12:30
      Mince Pie Steam Up 2024
      » read more «